Lesson Learned: Civil Society Support Initiative on Political Marginalization in the Niger Delta in Nigeria

The baseline study was well conducted and contributed to the project’s effectiveness as a training tool. It also provided needs assessment data concerning the beneficiary groups, representing marginalized communities. The data derived from the study was used to determine the issues to be addressed during the project. It also assisted in the selection of the CSOs and beneficiary groups with which the project would engage.
Project Partner
Kebetkache Women Development and Resource Centre
Project Description
The project was built on the grantee's experience of the most urgent problems of local communities in the Niger Delta, and particularly of women, youth and other vulnerable groups. It aimed to engage with three sets of stakeholders: CSOs at local level in the nine Niger Delta states; representatives of marginalized groups (women, youth and the disabled); and officials from three branches of government. The project’s focus on working with the CSOs and beneficiary groups in strengthening the basis for broader-based citizen participation in the political process was highly relevant to addressing the democratic deficit in a region where there is widespread distrust of the governing authorities and the absence of a belief that the voices of the people will make a difference in decision-making. Despite some limitations overall, the project proved to be effective in building the capacities of its target groups, in enhancing their self-confidence, and in motivating many to take further action. Follow-up activities undertaken by participants included “stepping down” the training to others in their local networks, and organizing advocacy and public awareness initiatives. The project succeeded in contributing to increasing the levels of participation in the public realm by both CSOs and beneficiary groups.
Evaluation Date
December 2012
Country
LESSON

Lesson Learned: Active democracy and political participation of tribal communities in the Indian Himalayas

The project was coherent, gender-appropriate and highly relevant to the needs of the beneficiaries living in the Himalaya region. The design of this project within a broader strategic planning and programming process also led to the individual actions being well designed and relevant.
Project Partner
Pragya
Project Description
The project’s principal objectives were to enhance civic participation among Himalayan tribes and empower marginalized groups (women, people with disabilities and nomads); and to engage with governance issues and democratic dialogue. To this end, the project aimed to build a supportive environment for enhanced democratic participation through supporting state and non-state actors. The project consisted of 10 core components creating a continuum of involvement from awareness of rights to access to those rights, supported by the training and mobilization of relevant support actors and those who could make the rights a reality. The project design was logical and very much tuned to the needs of the beneficiaries and other stakeholders in this challenging region. There were no delays in project delivery, since it had been designed with the seasonal obstacles relevant to the target region in mind.
Evaluation Date
October 2012
Country
LESSON

Lesson Learned: Reinforcement of the role and image of women in West African media

The project design put an emphasis on economic, social and political problems specific to women in the region: access to land ownership, discrimination, gender-based and family violence. It also aimed to support women’s participation in democratic governance by highlighting women’s concerns and opinions. In that sense the projects expected results constituted appropriate responses to the problems identified.
Project Partner
Panos West Africa
Project Description
The project was to promote journalistic content countering negative images of women and reinforce the role of women journalists in the media, including at leadership level. The project’s impact was very clear in Niger were it contributed to the publication of a “Charter for the Improvement of the Image of Women in the Media”. In Mali and Burkina Faso, stakeholders mentioned positive changes in relation to journalists’ training on the use of oral testimony. The Femedia prizes given as part of the project had an impact beyond those journalists and media houses that participated in the competition. However, the overall impact of the project could have been greater if the grantee had developed and implemented an explicit advocacy strategy addressing government authorities and media regulators. As it was, the project only addressed these stakeholders indirectly.
Evaluation Date
October 2012
Country
LESSON

Lesson Learned: Electoral Justice Principles for Trust in the Electoral Process in Ghana, Kenya, Sierra Leone

The development of a new set of norms for electoral justice by the project was arguably not necessary. Most practitioners interviewed and who responded to the survey agreed that there is a large gap between the fast-paced nature of elections administration and the slower machinery of the judicial sector and judicial reform, but felt that there was already a large and well defined body of principles that applied to the issue, but which were not labeled as “electoral justice.
Project Partner
Tiri-Making Integrity Work
Project Description
The Electoral Justice Principles for Trust in the Electoral Process project sought to raise the integrity standard of the electoral processes in Africa by addressing the relations between the key electoral justice institutions and their relevance and accessibility to the electorate. Its main objectives were to: produce a set of electoral justice principles drafted by a group of chief justices and senior electoral and political leaders from Africa and other continents; and support the implementation of these principles in two African countries. Its intended outcomes were to increase trust in electoral justice authorities; reduce violence related to electoral dispute settlements, and to have political parties, candidates and civil society organizations (CSOs) in the pilot implementation country able to claim, advocate and defend rights for public integrity consultations. The project undertook minimal consultations with the large and dynamic electoral assistance sector and missed opportunities to tap its experience, explore collaboration and develop synergies with other efforts, such as the Global Commission on Elections, Democracy and Security that promote the integrity of elections. The norms themselves were not disseminated as planned so awareness of them is extremely limited and they were not endorsed by any international organization as anticipated. Most of those interviewed felt the principles needed wider consultations and did not have the weight required to make significant changes. The project was not Africa-specific and African involvement was limited primarily to the launch in Ghana and the APEJ-SL. The principles and guidelines were global in scope, and were not tailored to Sierra Leone for the pilot. It also focused on general electoral integrity issues and lacked a clear focus on electoral justice and how specifically this could be achieved through the creation of a steering committee.
Evaluation Date
September 2012
Theme
Country
LESSON

Lesson Learned: Enhancing the Functional Protection of Human Rights in Ethiopia

The project suffered from insufficient risk analysis and mitigation. The original design failed to identify the challenging political environment in which the Ethiopian Human Rights Commission (EHRC) was operating. Solid project design should plan for scenarios related to each identified risk, and develop mitigation approaches to ensure that core objectives can be met.
Project Partner
International Development Law Organization
Project Description
The project aimed to develop the Ethiopian Human Rights Commission (EHRC) into a functional institution able to protect and enforce human rights in line with Ethiopian laws and international norms and standards. As the EHRC was a relatively young institution, the grantee did not only focus on the development of human rights protection skills, but prioritized in the project’s initial phase also the development of operational management capacity. The grantee could have adjusted the initial project plan to avoid overlap with activities already implemented under the Democratic Institutions Programme managed by UNDP. The relevance of the project was further limited by the grantee’s weak risk assessment and mitigation. The original design failed to appreciate the risks surrounding the project, most importantly the international grantee took permission to set up an office in Addis for granted which it then did not obtain. The project also appeared unprepared to address the challenging political environment in which the EHRC operated.
Evaluation Date
May 2012
Theme
Country
LESSON

Lesson Learned: Monitoring and Influencing the Central Budget by Civic Empowerment

Overall, the project demonstrated a commendable ability to adjust and adapt its plans as circumstances changed and new challenges emerged. However, adding new elements to an already multi-facetted project gave it an open-endedness and lack of completeness, particularly in its efforts to support civil society capacity development.
Project Partner
Turkish Economic and Social Studies Foundation
Project Description
The project aimed to enhance the capacity of civil society organizations at local level to influence the government budget and expenditure process, with particular emphasis on the social sector. The initiative took place in a governance environment where there is no tradition of using the budget as a means of holding the government accountable, at national or local levels, even in the Parliament. This project represents one component of the grantee’s broader effort to draw public and media attention to the importance of budget-making, while building the capacity of civil society to engage with government on budget matters, thus enhancing public accountability. The emphasis on the budget for the social sector was particularly relevant as a step towards drawing attention to, and seeking to improve, the situation of vulnerable and disadvantaged groups. Increasingly, the responsibility for administration of the social sector budget, including health and education, as well as social protection, rests with the municipalities. The selection of the Urban Councils and Women’s Assemblies as the focus for strengthening the role of civil society in monitoring the performance of municipal government was a relevant and appropriate choice, given the project objectives.
Evaluation Date
February 2012
Country
LESSON

Lesson Learned: Civil society advocating for quality education & healthcare in Mexico

The electoral process was blamed by the grantee for delays and difficulties in implementation. It apparently politicized the CSOs affiliated with the network in Guerrero and disrupted project coherence during large periods of time. In Hidalgo and Chiapas, project implementation did not appear to be affected by the political processes. Participants referred to the need to “start over” when new officials came into office because they felt that each party had different agendas and would not necessarily continue the work started under a previous administration.
Project Partner
Rostros y Voces FDS, A.C.
Project Description
The project sought to strengthen the collective voice and action of civil society in the Mexican states of Chiapas, Hidalgo and Guerrero. The focus was on increasing the ability of local CSOs and women, indigenous groups and youth to demand equitable and quality public education and healthcare services through strengthening the ability of CSOs to train, inform, and raise awareness of these rights, and giving opportunities for them to advocate for these services as a basic human right. The use of local level CSOs was an effective approach to implement community-based activities, but the lack of an integrated programme between the states and national level limited its usefulness and potential impact. The use of a diagnostic to develop training and an agenda for action was a good technique, but required more focus on issues of voice and civic participation which were the main objectives of the project. The project strengthened advocacy efforts for more equitable health and education services in its targeted areas in Chiapas, Hidalgo and Guerrero. In particular, it increased individual knowledge, capacity and leadership among participating CSOs and community members. However, the extent of results is unknown due to the lack of outcome data. Changes are likely to be sustainable at the level of personal empowerment and relationships built with some public officials and the agenda provides CSOs with some of the key health and education issues to raise with officials in the future.
Evaluation Date
February 2012
Country
LESSON

Lesson Learned: Strengthening women’s empowerment in municipal government

Consultation among implementing partners at project design stage and application of a less theoretical approach to project design might have mitigated the external risks threatening the delivery of the project.
It is vital to assess external risks and develop risk management plans for all projects at design stage. Depending on location, consider: the potential for natural disaster; political change, instability or hurdles; the capacity of partner organizations; and possible access restrictions on intended participants.
Project Partner
International Women’s Development Agency
Project Description
The project objective overall was on empowering women in eight Pacific Islands. Initially the project was to concentrate on Fiji, but after a number of specific challenges including floods, political instability and the termination of elected councilors in Fiji and the country’s suspension from the Commonwealth, the project had to be redesigned. The focus shifted from elected representatives at municipal level to women working at management and service-delivery levels in local government. The project also moved to become more regional, involving women in local government across the Pacific Islands. The project included gender awareness training, Training of Trainers (ToT) for women working in local government, the creation of a Women in Local Government network and website, multimedia outreach to the community to promote understanding of local government and the crucial role women play in service delivery, and a research and publication component. Although redesign was forced onto project holders by the political climate, it turned out that the local government approach and the regional nature of the project were its major strengths.
Evaluation Date
October 2011
Country
LESSON

Lesson Learned: Strengthening women’s empowerment in municipal government

The partnership was efficient and complementary. Each partner worked to its strengths and there was considerable capacity building among the partners. The intelligent allocation of roles and responsibilities between partners resulted in greater project efficiency by playing to the strengths of each partner.
Project Partner
International Women’s Development Agency
Project Description
The project objective overall was on empowering women in eight Pacific Islands. Initially the project was to concentrate on Fiji, but after a number of specific challenges including floods, political instability and the termination of elected councilors in Fiji and the country’s suspension from the Commonwealth, the project had to be redesigned. The focus shifted from elected representatives at municipal level to women working at management and service-delivery levels in local government. The project also moved to become more regional, involving women in local government across the Pacific Islands. The project included gender awareness training, Training of Trainers (ToT) for women working in local government, the creation of a Women in Local Government network and website, multimedia outreach to the community to promote understanding of local government and the crucial role women play in service delivery, and a research and publication component. Although redesign was forced onto project holders by the political climate, it turned out that the local government approach and the regional nature of the project were its major strengths.
Evaluation Date
October 2011
Country
LESSON

Lesson Learned: Assessing Democracy Assistance

All funders in the development assistance field, whether government agencies or private foundations, have shied away from funding research. The result was a cleavage between research as it would more traditionally be considered in the social, political and (more recent and largely Anglo-American) policy sciences, and programme design and implementation.
Project Partner
Fundación para las Relaciones Internacionales y el Diálogo Exterior
Project Description
The project “Assessing Democracy Assistance” was implemented by Fundación para las relaciones internacionales y el Diálogo Exterior (FRIDE) from 1 October 2009 to 30 September 2011. The project’s goals were to provide the first comprehensive assessment of global democracy assistance efforts based on the views and perceptions of local stakeholders and to ensure, through systematic dissemination and consultation among policy makers, opinion leaders, media and local stakeholders, the findings’ impact on future policy design. Whether the project succeeded in strengthening international commitment to democracy assistance and strengthening the quality of development assistance by improving the alignment between the supply and demand sides is difficult to judge, especially for a small, short-term intervention. However, evidence has been found that project results were broadly disseminated and cited among academics and practitioners worldwide. While the project did not provide capacity building and institution strengthening in the traditional sense, it did promote activities of a number of relatively young researchers, contributing to rejuvenating and strengthening the democracy community.
Evaluation Date
September 2011